6 weeks
| Name | Completed | Builder |
|---|---|---|
| San Sisto College | 2022 | ICM |
Beautiful architecture brickwork for the education project, ZIEGEL CO was able to complete the job within the time frame with the builder ICM, and put pride into the job.
| Name | Completed | Builder |
|---|---|---|
| San Sisto College | 2022 | ICM |
Beautiful architecture brickwork for the education project, ZIEGEL CO was able to complete the job within the time frame with the builder ICM, and put pride into the job.